IMG_LOGO

Blog

Job Update: Oak Ridge Replacement
July 12th, 2010 by Audrey

Valve Box and TankRiley & Company has completed the manufacturing of the lift station to replace the current station at Oak Ridge High School in Orlando. The job will be broken up into two phases; the first phase consists of the pre-plumbed wet well at 72″ in diameter and 198″ in depth, as well as the valve box, which is pre-plumbed with 4″ cast-iron valves.

Posted in Project Spotlights